Gosford
We work closely with our network of suppliers, engineers, and industry bodies to ensure quality workmanship every single time.

Ensure completed full remediation of the entire apartment rooftop including the demolition of 3 planter boxes, two layers of existing tiles and bedding and failed membrane systems. We prepared the concrete slab substrate and improved existing falls to new drainage outlets. Additionally, we supplied and installed a new Fatrafol 807V PVC Sheet Membrane System which included membrane upturned to brick cavity level and new cavity flashings connected to the floor membrane system via hot air fusion welding. After completion of the primary membrane system, we installed a new tiling bed, Class III over screed membrane system and re-tiled the associated areas. The works also included replacement of the existing non-compliant balustrade to meet NCC/AS compliance, new elastomeric membrane paint applied to masonry walls and new sheet metal capping installed over exposed external walls to prevent future water penetration to tops of walls.

All residents remained in place throughout the remedial building works and were managed carefully by the Ensure project team to make sure all residents were always communicated with.

For more information on this project, or if you’d like to discuss your own similar project, please get in touch via our get in touch page.

Our Reviews

Our Trusted & Certified Partners

fatra-australia
ardex
WPA
Bostik
sika-building-trust
tremco
drizoro

Central Coast Office

Unit 4 / 4 Dell Road, West Gosford, NSW 2250

Monday to Friday 7am to 5pm

Sydney Office

Unit 25 / 9 Salisbury Road, Castle Hill, NSW 2154

Monday to Friday 7am to 5pm

Connect with us

Ensure Waterproofing & Remedial © 2023 | All Rights Reserved | Developed by Digital Six